So i have like a connection from A, B, C to D.
Then i create a node E.
Can i move A, B, C connections to E?
I can select multiple connections with Shift, but seems i can not grab them all and connection them to another node.
I tried clicking the exact point in the middle of the node, but it always only selects one connection.